Our mission: to orchestrate the logistical complexity of this innovative project that brings together two major players, EFGL (THE FLOATING WIND TURBINES OF THE GULF OF LION) and Eolmed, each developing 3 10MW floating wind turbines.
Our expertise is deployed on several strategic axes:
• Integrated management of the port terminal and coordination of storage spaces
• Supervision of specialized handling operations and site maintenance
• Preparation and execution of critical lifting operations to integrate the turbine on the float scheduled for May 2025
This technical feat is based on a team of excellence:
• Grégoire H., Site Manager: management of operations and logistics supervision of the terminal
• Hugo B., Project Manager: managing contractual relationships with EFGL (THE FLOATING WIND TURBINES OF THE GULF OF LION) and Eolmed
Our commitment goes beyond simple project management. We are at the heart of an energy revolution, transforming complex technical challenges into concrete and sustainable solutions.
At Vulcain Engineering, we don't just support the energy transition - we propel it into the future thanks to our technical expertise and our ability to orchestrate complex projects!