Gum Growth

This project consists in managing the entire transfer of processes from Sweden to France, based on extensive analysis, precise sizing of the installations and end-to-end execution management within the framework of a fixed price commitment.

Duration

2023 - Ongoing

Countries

France

Sectors

Health and life science

Customer

No items found.
Photographie d'une usine

background

In an international industrial context requiring reactivity and perfect control of processes, this project is based on the transfer of know-how and technology from Swedish territory to France.

The mission begins with a detailed analysis of the existing process in Sweden, in order to identify its strengths and levers for improvement.

Next, a new manufacturing facility is designed to meet local requirements, integrating a global vision of technical and logistical needs. The sizing of processes and installations is based on a basic design, an overview of the process, a rigorous mass balance, as well as the development of schedules and plant layout plans. In addition, the detailed design phase covers the development of BFD, PFD and P&ID, the optimization of design data and the estimation of the CAPEX budget, while the technical specifications of the installations, utilities and electrical networks are precisely defined.

Finally, the management of execution and construction is based on a coordinated launch with a global team, thus guaranteeing a harmonious integration into a fixed contractual framework.

Customer needs

The client expects comprehensive and secure project management that guarantees the transfer and reengineering of industrial processes in a new geographical setting. It requires a thorough functional analysis of the existing system, the design of an installation adapted to local needs and a rigorous implementation in accordance with deadlines and within the CAPEX budget. The control of each phase, from design to construction execution, should allow for harmonious and unsurprising industrialization, supported by a firm commitment at a fixed price.

Photographie d'une personne sur un téléphone
Photographie d'une salle de réunion

Specificity of the mission

The mission aims to ensure a smooth transition of industrial processes between two territories. It includes an in-depth analysis of the Swedish process and the design of a tailor-made installation in France, integrating detailed sizing, technical design (BFD, PFD, P&ID) and CAPEX estimation. Execution management, from the start of construction to global coordination, ensures delivery in accordance with contractual and technical requirements, while optimizing resources.

Image gallery

In addition to cookies that are strictly necessary for the operation of this website, Vulcain Engineering Group uses cookies and other tracking tools to remember your preferences and offer you additional services, to measure the performance of our website.

You can click on “Accept all cookies” to consent to the uses mentioned above, click on “Cookie Settings” to configure your choices, or click on “Reject all” to refuse all optional cookies.